01 / Scope

Operations define the system

Document pedestrian, cart, vehicle, impact, chemical, temperature, and washdown conditions before selecting a coating build.

02 / Scope

Downtime must be specific

Separate preparation, installation, cure, restricted access, and full-service return. Phasing may be more valuable than the fastest chemistry.

03 / Scope

Documentation supports comparison

Commercial proposals should identify products, thickness, preparation profile, repairs, termination details, testing, and warranty.

Quote review

The material label is not the complete proposal.

Compare surface preparation, repairs, actual product names, layer sequence, coverage, texture, cure schedule, exclusions, and warranty. A low square-foot figure without those details is difficult to evaluate.