01 / Scope

Vertical work changes labor

Machines used on the main slab do not prepare every wall edge or riser. Detail grinding, hand tools, masking, and application technique add scope.

02 / Scope

Termination lines should be planned

Decide where the coating stops at drywall, masonry, stairs, door tracks, drains, and transitions before work begins.

03 / Scope

Appearance can vary

Broadcast density and clear-coat flow behave differently on vertical surfaces. Review the expected finish rather than assuming it will match the floor exactly.

Quote review

The material label is not the complete proposal.

Compare surface preparation, repairs, actual product names, layer sequence, coverage, texture, cure schedule, exclusions, and warranty. A low square-foot figure without those details is difficult to evaluate.