01 / Scope

Traffic is not uniform

Aisles, rack ends, turns, docks, and staging zones can wear differently. Use mapping to decide where build, texture, or repair scope changes.

02 / Scope

Joints remain part of the slab

Large commercial slabs rely on joints and can move. Joint treatment should be separate from decorative crack filling.

03 / Scope

Phasing protects operations

The shortest cure is not useful if material flow, ventilation, safety barriers, and access cannot be maintained.

Quote review

The material label is not the complete proposal.

Compare surface preparation, repairs, actual product names, layer sequence, coverage, texture, cure schedule, exclusions, and warranty. A low square-foot figure without those details is difficult to evaluate.